DSCN0411.JPG


Adapter to connect the plastic to the clay.
Comments(0)
DSCN0412.JPG


The hub for the clay and the plastic pipes. This 45 degree T is for the cleanout.
Comments(0)
DSCN0413.JPG


Comments(0)
DSCN0414.JPG


Comments(0)
DSCN0415.JPG


The new valve on the feed line, and memories of a sweating job that went somewhat less than perfectly, but succeeded none the less.
Comments(0)
DSCN0416.JPG


Keeping the torch lit was a challenge.
Comments(0)
DSCN0417.JPG


Comments(0)
DSCN0418.JPG


Since packing for the clay pipe was unavailable everywhere we looked, concrete is being used as a substitute.
Comments(0)
DSCN0419.JPG


Comments(0)
DSCN0420.JPG


Comments(0)
DSCN0422.JPG


Comments(0)
DSCN0423.JPG


That should hold.
Comments(0)
DSCN0424.JPG


Comments(0)
DSCN0425.JPG


Comments(0)
DSCN0426.JPG


22 1/2 degree turn. Glued.
Comments(0)
DSCN0427.JPG


Comments(0)
DSCN0428.JPG


3 inch sanitary T into the 4 inch main drainpipe. Glued.
Comments(0)
DSCN0429.JPG


Comments(0)
DSCN0430.JPG


The pipe under the house hasn't been glued together yet. The final joint will be glued when the exact position of the drainpipe from upstairs is determined.
Comments(0)
DSCN0431.JPG


Comments(0)
DSCN0432.JPG


Comments(0)
DSCN0433.JPG


Dining room wall has had most of the drywall removed. No surprises here.
Comments(0)
DSCN0434.JPG


Comments(0)
DSCN0435.JPG


This wall has been munched on a bit.
Comments(0)
DSCN0436.JPG


Comments(0)
DSCN0437.JPG


Hungry hungry termites. Not as bad as the hallway wall though.
Comments(0)
DSCN0438.JPG


The doorway between the dining room and the hallway. Newly excavated.
Comments(0)
DSCN0439.JPG


Junk from the dining room was moved to the living room before wallstripping commenced.
Comments(0)
DSCN0440.JPG


Comments(0)
DSCN0441.JPG


Doorway from the hallway.