DSCN0900.JPG
Toilet is in.
Comments(0)
|
DSCN0901.JPG
Comments(0)
|
DSCN0902.JPG
Shower plumbing is done. Part of this will be removed to put up the cement board, after which it will be reattached permanantly.
Comments(0)
|
DSCN0903.JPG
Network connection in back of the toilet tank. Not the most convienent place to access it, but it'll work.
Comments(0)
|
DSCN0904.JPG
Overhead light in the room.
Comments(0)
|
DSCN0905.JPG
Shower light.
Comments(0)
|
DSCN0906.JPG
Comments(0)
|
DSCN0907.JPG
Got the sink in. The top did NOT go in without a fight. The good news is, it won't come out without a fight either.
Comments(0)
|
DSCN0908.JPG
Medicine cabinet is in. I will at some point get 3 more lightbulbs.
Comments(0)
|
DSCN0909.JPG
Faucet.
Comments(0)
|
DSCN0910.JPG
Drain.
Comments(0)
|
DSCN0911.JPG
Feed for the toilet. It's on the wrong side of the tank, but it was easier putting it on this side.
Comments(0)
|
DSCN0912.JPG
Lightswitches.
Comments(0)
|
DSCN0913.JPG
Comments(0)
|
ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0ics&theme=0