DSCN0517.JPG
More of the drywall has been torn down. There's been a bit of water damage over the years.
Comments(0)
|
DSCN0518.JPG
Excavating the chimney.
Comments(0)
|
DSCN0519.JPG
Comments(0)
|
DSCN0520.JPG
Comments(0)
|
DSCN0521.JPG
A mess.
Comments(0)
|
DSCN0522.JPG
Sweating copper has been partially completed.
Comments(0)
|
DSCN0523.JPG
Pipes on the left are for the sink. Pipes on the right are for the shower.
Comments(0)
|
DSCN0524.JPG
Pipes that run off to the left are for the sink in the bedroom.
Comments(0)
|
DSCN0525.JPG
Comments(0)
|
DSCN0526.JPG
Comments(0)
|
DSCN0527.JPG
The pipes are capped at the moment. This is so we can do a high pressure test on all the pipes before putting down the floor. After the floor is put down, the caps will be removed and valves for the sink and the manifold for the shower will be installed.
Comments(0)
|
DSCN0528.JPG
Bucket of water available in case of an emergency torch related accident.
Comments(0)
|