Picture Index

DSCN0517.JPG


More of the drywall has been torn down. There's been a bit of water damage over the years.
Comments(0)
DSCN0518.JPG


Excavating the chimney.
Comments(0)
DSCN0519.JPG


Comments(0)
DSCN0520.JPG


Comments(0)
DSCN0521.JPG


A mess.
Comments(0)
DSCN0522.JPG


Sweating copper has been partially completed.
Comments(0)
DSCN0523.JPG


Pipes on the left are for the sink. Pipes on the right are for the shower.
Comments(0)
DSCN0524.JPG


Pipes that run off to the left are for the sink in the bedroom.
Comments(0)
DSCN0525.JPG


Comments(0)
DSCN0526.JPG


Comments(0)
DSCN0527.JPG


The pipes are capped at the moment. This is so we can do a high pressure test on all the pipes before putting down the floor. After the floor is put down, the caps will be removed and valves for the sink and the manifold for the shower will be installed.
Comments(0)
DSCN0528.JPG


Bucket of water available in case of an emergency torch related accident.
Comments(0)
805pics&theme=0805pics&theme=0805pics&theme=0805pics&theme=0805pics&theme=0805pics&theme=0805pics&theme=0805pics&theme=0