dcp_1266.jpg
Most of the lumber gone now, all moved upstairs.
Comments(0)
|
dcp_1267.jpg
Comments(0)
|
dcp_1268.jpg
Comments(0)
|
dcp_1269.jpg
The third joist has been nailed in, and now supports two 4x8 sheets of plywood.
Comments(0)
|
dcp_1270.jpg
Comments(0)
|
dcp_1271.jpg
Two more joists and a third sheet. New electrical wiring runs between the joists.
Comments(0)
|
dcp_1272.jpg
Comments(0)
|
dcp_1273.jpg
Comments(0)
|
dcp_1274.jpg
Comments(0)
|
dcp_1275.jpg
All the knob & tube wiring has now been replaced with a modern, and significantly safer alternative.
Comments(0)
|
dcp_1276.jpg
Here we connected the new wiring and the molex down to the outlets in the walls. Enough slack remains here so when the walls downstairs get stripped, the new wiring will be pulled down to replace the old.
Comments(0)
|
dcp_1277.jpg
Comments(0)
|
dcp_1278.jpg
Few problems that can't be solved with a drill, a hacksaw, and a hammer.
Comments(0)
|
004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0004pics&theme=0